Free shipping on orders over $50
$3.50
10000 in stock
Heavy-duty Schedule 80 PVC construction. Threaded ends comply with ANSIB2.1. Import. Gray.
ABS Schedule 40 DWV. 90 Degree (1/4 bend). Hub x Hub. Used to change direction in piping in drain-waste-vent applications.
ABS Schedule 40 DWV. (1/16 bend). Hub x Hub. Used to change direction in piping in drain-waste-vent applications.
4 x 3, (3″ hub inside 4″ ABS), flush to floor, 1-piece ring, closet flange.
Total knockout (TKO) closet flange with stainless steel swivel ring. 3″ hub/inside 4
Subtotal: $51.00
View cartCheckout